FRP exhaust stack and scrubber with access platforms
SCRUBBER, DUCTING AND STACK
BALANCE OF PLANT · EXHAUST

Ducting, hoods, dampers and stacks for complete exhaust systems

The parts that decide whether the scrubber ever sees the fume. FRP and thermoplastic ducting, capture hoods, dampers, stacks and supports, designed to ACGIH and checked in CFD.

875,000
CMH largest exhaust installation
50 m
Exhaust stack height executed
Ø 3,000
mm stack diameter executed
BUILT TO  ACGIH · SOLIDWORKS FLOW SIMULATION
01 — CONFIGURATIONS

Everything between the source and the sky.

Balance of plant is where exhaust systems quietly fail — hoods that do not capture, ducts that are out of balance, stacks that are too short. We design it with the equipment, not after it.
TYPE 01
FRP and PP ducting
Round and rectangular ducting, bends, transitions and expansion joints.
FRP · PP · PVC
TYPE 02
Capture hoods and LEV
Canopy, slot, lip and push-pull hoods designed for capture velocity.
ACGIH
TYPE 03
Dampers
Manual and actuated dampers for isolation and balancing.
MANUAL · ACTUATED
TYPE 04
Exhaust stacks
Self-supporting and guyed FRP stacks with platforms and sampling ports.
TO Ø 3,000 × 50,000 MM
02 — SPECIFICATION

The envelope, in numbers.

Static head loss is worked out on in-house tools to ACGIH, and flow is checked in SolidWorks Flow Simulation before layout is frozen.

PARAMETER
RANGE / CAPABILITY
Largest installation
875,000 CMH, primary and secondary exhaust
Stack executed
Ø 3,000 mm × 50,000 mm
Materials
FRP · FRVE · PP · PVC
Duct design
ACGIH, in-house static loss analysis
Flow verification
SolidWorks Flow Simulation (CFD)
Layout
Parametric 3D in SolidWorks
Duct size range
[confirm range]
Supports
Structures, platforms, ladders, handrails
Values in square brackets are placeholders for your engineering team to confirm. Every unit is sized against the actual duty.
03 — APPLICATIONS

Where balance of plant matters most

Scrubber systems
Hoods, ducting and stack around packed bed and FGD scrubbers
Process lines
Plating, pickling, anodising and etching line exhaust
Nuclear and research
High-integrity exhaust for fuel fabrication and laboratories
Steel
Primary and secondary melt shop exhaust
04 — HOW WE SIZE IT

Four things an exhaust system has to get right.

Capture at the source. Hood type and capture velocity chosen for how the fume is released.
Duct velocity and balance. Each branch drawing its design airflow, with dampers set at commissioning.
Static loss. Every fitting counted, so the fan is sized for the real system.
Stack height and structure. Height to statutory norms, structure designed for wind.
TO QUOTE, SEND US
Sources and number of pick-up points
Fume composition and temperature
Plant layout drawing
Statutory stack requirements
Existing equipment to connect
Start an enquiry
05 — CONSTRUCTION

What a complete exhaust package includes

01
Hoods
Designed per source for capture, not copied from a standard.
02
Ducting
FRP or thermoplastic, with flanged joints and expansion allowance.
03
Dampers
For isolation and balancing, manual or actuated.
04
Stack
FRP stack with sampling ports, platforms and lightning protection.
05
Structures
Supports, pipe racks and access platforms.
REFERENCE INSTALLATION
Ø 3,000
MM × 50,000 MM EXHAUST STACK
Public-sector nuclear facility
A 50-metre FRP exhaust stack, alongside twin 27,000 CMH pickling and de-jacketing exhaust systems.
06 — IN SERVICE

Units we have built and commissioned

All projects →
scrubber and stack
SCRUBBER AND STACK
ducting and stack
DUCTING AND STACK
scrubber train with ducting
SCRUBBER TRAIN WITH DUCTING
commissioned system
COMMISSIONED SYSTEM
07 — QUESTIONS

What engineers ask us first

These answers are also written for search. Each question is a query buyers type into Google, which is why the FAQ block sits on every equipment page.

Why buy ducting from the scrubber supplier?+
Because the fan is sized on the whole system. When ducting and equipment come from different suppliers, nobody owns the static loss, and the system underperforms.
Can FRP stacks go to 50 metres?+
Yes. We have executed a Ø 3,000 × 50,000 mm FRP exhaust stack.
Do you design push-pull exhaust?+
Yes, for pickling, plating and anodising lines, designed with the tanks.
Can you rebalance an existing system?+
Yes. Our service team can survey airflows at each hood and rebalance or modify the ducting.
ENQUIRY

Pick the equipment. We will send you the data sheet.

Choose the equipment you need. We will take three details, then send you the enquiry data sheet for that product — the one our engineers use to size and quote.

+91 22 4970 9140·WhatsApp an engineer
Already know what you need? Download data sheets directly
RELATED EQUIPMENT
Bhavi Plast
Bhavi Plast

FRP and dual-laminate process equipment, engineered, built, installed and maintained under one contract. Established 1977.

EQUIPMENT
COMPANY
APPLICATIONS
HCl fume scrubbing
Cl₂ and NH₃ scrubbing
H₂SO₄ mist removal
Flue gas desulphurisation
Pickling line exhaust
Solar PV and semiconductor exhaust
CONTACT
603 Dev Corpora, Cadbury Junction,
Khopat, Thane (W) 400 601
Maharashtra, India

Plant — Mankoli, Bhiwandi
+91 22 4970 9140
mb@bhaviplast.com / jm@bhaviplast.com
© 2026 BHAVI PLAST PRIVATE LIMITED
PRIVACY · TERMS · HSE POLICY · SITEMAP
WhatsApp an engineer +91 22 4970 9140